When production is finished it is showing the "Processing time". The value is only showing the last session of the engine for that production - not the total processing time. Please change it to be "Total Processing Time".
Keep photo selection when selecting different Tie/Control point. Problem example: First I have selected a couple of photos to Tie Point 1 in Survey tab. Then moved to Tie Point 2 and viewing a photo (that is not in Tie Point 1), in the photo I hav...
When adding images to a new block there is an option to modify between Sea Level or WGS 84 Ellipsoid.
After modifying or not there is no place that it is stated what was selected.
We wish to know what was selected in each block.
Overlap Report after AT that shows the Longitude overlap (minimum 80%) and the Lateral overlap (minimum 50%). The user should have an estimation if the overlap meets the requirements - therefor if more photos should be added somewhere.
Limit the extents of an orthophoto production to a region of interest
Have tried editing region of interest and extents of production and neither of these apply to orthophoto productions. It would be nice to limit the orthophoto extents to a user defined polygon (just like you can define an area of interest for a mesh)
To import from the oblique camera of CityMapper-2, please create the template. This idea is from a Japanese user. • all data (images): Preparing
• What mobile mapping acquisition platform was used?
--- o Camera system used:
--- o Lidar system ...